Case study
Project overview
A leading cement manufacturer in India was facing emission compliance and performance challenges with the electrostatic precipitator (ESP) installed at its clinker cooler.
Thermax partnered with the customer to enhance ESP performance and ensure continuous, compliant plant operations without major mechanical modifications.
Challenges
- Frequent spark occurrences observed in the clinker cooler ESP TRCC panel
- Voltage and current readings were below standard operating requirements
- Stack emissions from the clinker cooler were nearly 70% higher than the permissible limits
- Need to improve ESP performance without extending ESP fields or undertaking costly mechanical upgrades
Solution
- Replaced existing TR controllers with Thermax Opticor® advanced controllers
- Implemented a compact, plug-and-play solution with a low footprint and pre-wired cables
- Enabled better power delivery to ESP fields, improving dust charging and collection
- Allowed remote monitoring and control through Opticor®’s modular design
Result
- Particulate emissions reduced by 25%, bringing stack emissions within regulatory limits
- Significant reduction in spark occurrence
- Improved voltage and current supply across ESP fields, leading to higher dust collection efficiency
- Enhanced overall ESP performance without costly mechanical modifications
- Enabled stable, reliable, and compliant operation of the clinker cooler ESP
Case study
Thermax Opticor® reduces emissions by 20% from ESP without equipment replacement
Case study
Compact yet powerful: Thermax’s advanced baghouse solution for cement plant expansion
Case study
Steel manufacturer improved ESP performance by 40% with Thermax Opticor®
Case study
Strengthening India’s solar manufacturing with indigenous air pollution control solutions
Case study
Thermax Ne0 showcases the true potential of VSA technology in biogas upgradation