Up to 200 TPH
WHRB in Coke Calcination Plant

WHRB in Coke Calcination Plant

Pioneering waste heat recovery solutions for coke calcination plants, converting wasted thermal energy into valuable resources

Submit your enquiry

Coke calcination involves high-temperature treatment of petroleum coke, emitting substantial waste heat. TBWES WHRBs installed in the flue gas stream recover this heat to generate steam. 

The steam supports power generation or plant operations, enhancing energy recovery and reducing environmental impact. This results in lower operational costs and a cleaner, more sustainable calcination process.

Technical data

  • Product capacity / performance range

    • Capacity: Up to 200 TPH

    • Pressure: Up to 130 Kg/cm2(g)

    • Temperature: Up to 540°C

  • Heat sources - Flue gases from coke calcination kilns

  • Compliance or standards followed – ASME / IBR / TRCU / PED

  • Flexibility or customisation options – The product can be customised based on customer needs or scale

Product features

Integrated soot blowing system
Ensures clean heat transfer surfaces and efficient operation
Water wall panel construction
Robust design in first and second pass for effective heat absorption
Modular site / port assembly
Facilitates faster, efficient installation with modular construction
Horizontal and vertical configurations
Available in both orientations to suit site requirements
Up to 540°C 10 to 70 kg/cm²(g)