Enabling compliance for a power company

Thermax FGD solutions enable emission compliance for the thermal power industry

Project overview

A large thermal power generation facility required a flue gas desulphurisation (FGD) system for its 2 × 500 MW coal-based power plant to comply with stringent emission norms.

Following a highly competitive bidding process, Thermax was selected to deliver a comprehensive EPC solution for the FGD systems across both units.

Project <strong>overview</strong>
Challenges

Challenges 

  • Need to meet strict SO₂ emission norms for large-capacity power units
  • Integration of FGD systems with existing boiler and power plant operations
  • Requirement for reliable commissioning without impacting boiler availability
  • Execution under tight quality, safety, and performance benchmarks
Solution

Solution 

  • Thermax executed the complete EPC scope for the FGD plant, covering:
  • Engineering, supply, inland transportation, insurance, installation, testing, and commissioning
  • FGD system packages for both 500 MW units
  • Erection of a 200 TPH coal handling plant and conveyor system
  • Performance guarantee testing to ensure emission compliance
  • Structured commissioning trials to ensure seamless plant integration
Result

Result 

  • SO₂ removal efficiency of 94.25% achieved during commissioning trials
  • Gypsum production commenced successfully on the first attempt
  • No boiler tripping recorded during FGD unit commissioning
  • Reliable and stable operation of the FGD system
  • A key milestone in enabling cleaner, more sustainable power generation
Explore our case studies
Thermax delivers a turnkey EPC project for a Middle East cement major

Case study

Thermax delivers a turnkey EPC project for a Middle East cement major

Read the case study
Thermax’s cogeneration solutions enable a paper manufacturer   to optimise power and process steam generation

Case study

Thermax’s cogeneration solutions enable a paper manufacturer to optimise power and process steam generation

Read the case study