Ensuring reliable power for the cement industry

Thermax EPC solutions enable efficient captive power generation for a cement major

Project overview

Power plant EPC & O&M solutions

With a requirement of 40 MW power and a strong focus on efficiency, water conservation, and long-term operational reliability, the project demanded an experienced EPC partner. Thermax was selected to deliver a complete power plant solution along with operations and maintenance support.

Project <strong>overview</strong>
Challenges

Challenges 

  • Requirement for 40 MW reliable captive power
  • Need for low water consumption in a water-scarce region
  • Use of multiple fuels with varying calorific values
  • Tight project execution timelines
  • Compliance with stringent emission norms
Solution

Solution 

  • Thermax executed the project on an EPC basis with a comprehensive and integrated approach.
  • Commissioning of two coal-fired CFBC boilers (90 TPH each) designed for multi-fuel firing, including coal, pet coke, RDF (refuse derived fuel), and wood chips
  • Installation of a condensing steam turbine with an air cooled condenser to minimise water consumption
  • Erection of a 200 TPH coal handling plant with a 1,200-metre conveyor system
  • Execution of over 7,500 MT of equipment erection within 8–9 months, including significant local fabrication and extensive E&I cabling
  • Installation of a water treatment plant and high-efficiency bag filters meeting stringent emission norms
  • Use of bolted and preassembled structures along with automation to accelerate project completion
Result

Result 

  • Successful commissioning of the power plant within 18.5 months
  • Reliable 40 MW power supply supporting continuous cement plant operations
  • Reduced water consumption through air-cooled condenser design
  • Compliance with emission norms through high-efficiency pollution control systems
  • Long-term plant operation and maintenance managed by Thermax, ensuring sustained performance
Explore our case studies
Thermax successfully commissions FGD for a GOI’s power plant

Case study

Thermax successfully commissions FGD for a GOI’s power plant

Read the case study
Thermax’s cogeneration solutions enable a paper manufacturer   to optimise power and process steam generation

Case study

Thermax’s cogeneration solutions enable a paper manufacturer to optimise power and process steam generation

Read the case study